It was weird how the first few days so much seemed to get done. By Day 4, progress had slowed considerably. This, of course, was due the the sheer number of cuts. We were after all putting large tiles in a very small space.
They left a racing stripe around the top and built a niche for the shampoo and soap bottles.
The tile went all the way up to the ceiling, and then they made the decision to raise the wainscoting on the walls to give plenty of room to cover the sink.
The color doesn’t show so well, but the racing strips are different shades of blue and the back of the niche is glass shards, also in blues.
The shower floor complete with drain. My son hasn’t complained that the glass floor tiles are slippery.
Finished with all but the shower doors installed. We originally had a blue vanity but the drain layout would not accommodate it. So we were left with one that matches the tile instead of stands out.
Either way, The bathroom is now fabulous and my son and his cats are very happy. All that remains is some patching of the drywall, the light/fan installation, and some paint before we hang the mirrors and shelves.
Until next time.
Nothing a cat likes better than a remodeled bathroom.
The kitties are happy. Who cares what the humans think. haha. Looks wonderful.